Chairman Pip's Railway Thoughts

Stop arseing about!!

Posted in Business, Customer service, Europe, High Speed, Politics, Rolling stock by Chairman Pip on 19 July 2013

Now that the initial fall-out from what might be termed the “Fyra fuck-up” has begun to move onwards, we now move into the realm of “what the bloody hell do we do now?”. Fyra has started using what it started up with, loco-hauled stock behind a Bombardier TRAXX locomotive running its services between Amsterdam and Brussels along conventional lines. NS has also made requests of other high speed operators (notably Thalys and Eurostar) that it implement plans to run additional services to Amsterdam as soon as possible. But it still leaves them in a pickle, in that part of the service agreement for HSL Zuid is the running of domestic high-speed services, for which the V250 sets were procured. The Dutch government has given NS three months to come up with an alternative to the planned Fyra service before it begins to talk to private operators about taking on the concession to use HSL Zuid. Of course, NS must come up with its solution in the knowledge that it has no high speed rolling stock available for its own use. NS Hispeed, the arm of the company responsible for high speed services, directly owns two of Thalys’ Series 43000 units and four of the Class 406 sets used by Deutsche Bahn, but these are pooled with the other units in each respective fleet for specific services. So, NS would need to source rolling stock from elsewhere, with the primary requirement being that it be able to operate over three electrical systems – 25kV (on the high speed lines), 3kV (Belgian classic lines) and 1.5kV (Dutch classic lines).

In February 2013, TGV Lyria, the name given to the TGV services between France and Switzerland, began replacing the rolling stock it originally used. Its original fleet encompassed nine Series 33000 TGV sets, which are tri-voltage variants of the original PSE sets used by SNCF. Presumably these are now going spare (unless of course SNCF has already re-allocated them), and presumably these would fit the loading gauge to run between Brussels and Amsterdam (although that’s something I have no idea of), so would it not be possible, at least as an interim measure, to obtain these for a period until NS can put in place plans to purchase some new, purpose built stock for Fyra? Given that they are still in service around the TGV network, there’s no reason to assume that these sets are on their last legs, and seem to me to be ideal for the kind of services NS (through Fyra) are contracted to provide.

Leave a comment